ACC XML Rejection responses
Posted by Jane Hughes, Last modified by Sinclair Hughes on 16 March 2022 09:41 AM
|
|
If your electronic claim(s) are Rejected by ACC using their File Upload Applet (see below), carry out the steps below to troubleshoot and identify the issue(s): Locate the response file
Possible Error messages and potential solutionsThere are numerous error messages, but some of the most common ones are as follows: Accident date must be on or before todayAn incorrect date of accident has been entered for one of the claimants. Locate the appropriate line in the file that was rejected to identify the patient, i.e. <schedule_line_number>14. Correct the date of accident in the patients file (Patient - Claim). Either service code, contract number or service date is invalidService CodeCheck that you are using a valid ACC Service Item Code (Alias Code). Only valid ACC Service Item Codes will be accepted for uploading. A single incorrect entry will result in the whole schedule being rejected. The Item # field in SPM is used to populate the Service Item Code in the ACC field. In the XML file, this is preceded with: <service_item_code> Please refer to your ACC Contract for a full list of the Service Item Codes to check that you are using the correct code(s). Solution:1. Correct the service code in Incisive by editing the entry concerned via:
2. Recreate the XML file via Office - Schedules - Process - option 2 Original Schedule. Contract numberIf this error is repeated for each line of the claim, then it is most likely that the Contract number being used to submit the claim is incorrect. Locate the file that was rejected and find the following segments in the message: <vendor_acc_identifier> <contract_acc_identifier> Note the details used and check that these are correct against your contract (and for the date of the services you are claiming). Solution:1. Amend the contract details configured in Incisive by editing the relevant contact:
2. Recreate the XML file via Office - Schedules - Process - option 2 Original Schedule. Service DateYour ACC Contracts are date dependent. On the 1 July 2021 your ACC Clinical Services Contract number will have changed for services provided on or after 1 July.
Once you have identified the issue(s) you will need to correct as follows: Wrong Contract number used for services claimed:Amend the contract details (see contract number above) and recreate the XML file (see above). Once the newly created files are correctly uploaded, amend your contract details. Schedule contains a mix of dates (pre and post 1 July):You will need to recreate your schedule and split it in two. 1.Use the Resubmit option in Office - Schedules.
2. Process the new schedule. 3. Credit all items off the original schedule. 4. If you placed items on hold, after processing these will be moved onto the next new schedule. | |
|